03/12/2019

Handover of the prototype box body emergency ambulance to our costumer East of England Ambulance Service NHS Trust

Last week, we handed over the prototype box body emergency ambulance to our costumer East of England Ambulance Service NHS Trust (EEAST). For the handover our costumer from England was accompanied by our colleagues from W.A.S UK. Because of the Stryker Power-LOAD on-board (the first powered cot fastener system for EEAST) Stryker UK was there, too, to explain the system and answer any question. Till 2022 we are going to build ca. 500 vehicles for EEAST, all vehicles are equipped with the Power-LOAD System.

We say THANK YOU for visiting us in Germany and we wish always a good trip!

to top